The Town Of Carolina Beach
Carolina Beach 3rd Pressure Filter & Raw Water Well 15 Project This project consists of the furnishing of all materials, labor and equipment to install a 3rd vertical pressure filter ( 10 ft. diameter) in the existing Alabama Avenue water treatment plant, which includes all piping, valves and a triplex electrical control panel. The project also includes the installation of a raw water well # 15, well pump, prefabricated building, interior piping, valves, meter, approximately 1, 250 linear feet of 6& rdquo;
Bid Close Date: