Los Angeles County Public Works - CA
**** Rosewood 139th Street, et al. Phase II Proposed work includes cold- mill enough existing pavement to produce cold central planted recycled pavement ( CCPR); pulverize and stabilize the remaining existing pavement with the underlying base material and/or soil to produce cement stabilized pulverized base ( CSPB); and place a layer of rubberized hot- mix asphalt over the CCPR on CSPB to provide a long lasting finished driving surface.
Bid Close Date: