Commonwealth Of Kentucky - Facilities & Support Services - KY
RFB- 120- 27 Re- Ad of RFB- 29- 26 ****, LETCHER COUNTY
Removal of failed silt pond standpipe and construction of new spillway in Letcher County Removal of existing silt pond standpipe, construction of 150 class III 4 flat bottom ditch, construction of 2 silt trap rock, construction of 20 LF of 36 HDPE pipe, construction of 2 sloped and flared headwalls, mobilization, site prep, revegetation, grout to seal standpipe, roadway stone, bituminous repair, earthwork to excavate pond dam
Bid Close Date:
Lot 1: ONLY ONLINE BIDS WILL BE ACCEPTED FOR THIS RFB. Emailed and hard copies delivered by any method WILL NOT BE ACCEPTED. On this line, Bidders must enter $ 0. 00 for Contract Amount in the e- procurement system. Actual Contract Amount must be entered on " Official Bid Document" and submitted as an attachment in the e- procurement system. Vendors should review and update, if necessary, all addresses and contact persons for their account prior to bid submission. This information will carry forward to a contract if awarded, therefore please ensure all information is correct. Entire Official Bid Document and Bid Bond ( if required) should be combined as one PDF and uploaded This Site will consist of the removal of an existing silt pond standpipe that has failed and is in danger of a complete dam breach. A 150 Class III 4 flat bottom ditch will be constructed to align the new spill way to the existing channel. The construction of 2 each Silt Trap ( Rock) to catch silt during the removal of silt pond, then taken out. The construction of 20 LF of 36 HDPE pipe in access road and 2 each slopped and flared headwalls. Mobilization is setup to provide for construction equipment to be delivered to the site. Site Prep is included, at the site for reclamation and material storage. Revegetation is included for all revegetation efforts within the site. Grout is included to seal up the Standpipe for the pond. Roadway Stone are included to provide for access during normal reclamation. Bituminous repair is included to replace IN KIND and surfaces disturbed. Earthwork work bid item is included to excavate pond dam and other areas as directed by the ENGINEER. Material will be wasted on- site.