City Of Manitou Springs
Midland/Arizona Sanitary Sewer/Water AIS Component Rectification The work of this Contract generally includes modifications, removals and replacements of wastewater collection system and water distribution system infrastructure in Owner& rsquo; s utility system to attain compliance with American Iron and Steel ( AIS) requirements of a funding agency 1. Develop and provide an approved traffic control plan for implementation throughout the project when work accomplished in public rights- of- way2. Develop a
Sanitary sewer and water distribution system infrastructure rectification Bid Schedule A: General conditions including traffic control and erosion/sediment control. Bid Schedule B: Removal and replacement of existing precast concrete manhole components and compression couplings, and replacement of hot mix asphalt pavements. Bid Schedule C: Removal and replacement of existing insertion gate valve. Additive Bid Schedule No. 1: Internal pipe inspection with closed circuit video. Additive Bid Schedule No. 2: Construction of new wastewater collection system piping on Arizona Road. Additive Bid Schedule No. 3: Construction of new wastewater collection system piping on Midland Avenue.
Bid Close Date:
Lot 1: Manhole No. 1 - 16" High x 48" ID Barrel Section 16" High Eccentric Cone Section
Lot 2: Manhole No. 2 - 12" High x 48" ID Barrel Section 24" High Eccentric Cone Section 2" High x 24" ID Adjusting Ring
Lot 3: Manhole No. 3 - 8" High ( with grove joint) Flat Top with 24" ID Access Penetration
Lot 4: Manhole No. 4 - 12" High x 48" ID Barrel Section 8" High ( with grove joint) Flat Top with 24" ID Access Penetration
Lot 5: Manhole No. 5 - 30" High x 48" ID Barrel Section 16" High Eccentric Cone Section
Lot 6: Remove & Replace Non Compliant Compression Couplings - 4" Diameter PVC x PVC
Lot 7: Remove & Replace Non Compliant Compression Couplings - 4" Diameter PVC x VCP
Lot 8: Remove & Replace Non Compliant Compression Couplings - 6" Diameter PVC x PVC
Lot 9: Remove & Replace Non Compliant Compression Couplings - 6" Diameter PVC x VCP
Lot 10: Remove & Replace Non Compliant Compression Couplings - 8" Diameter PVC x PVC
Lot 11: Remove & Replace Non Compliant Compression Couplings - 8" Diameter PVC x VCP
Lot 12: Full Depth Hot Mix Asphalt - 2 Lifts, 3" Compacted Thickness each, total 6" Compacted Thickness
Lot 13: Remove & Replace Existing Insertion Gate Valve ( AIS Compliant)
Lot 14: Traffic Control
Lot 15: Erosion & Sediment Control Plan
Lot 16: Mobilization & Demobilization
Lot 17: ADDITIVE BID SCHEDULE NO. 1 - Pipe Inspection With Closed Circuit Video With Recording - 4 Pipe Segments ( 6" or 8" Diameter)
Lot 18: ADDITIVE BID SCHEDULE NO. 1 - Pipe Inspection With Closed Circuit Video With Recording - 1 Pipe Segments ( 4" Diameter)
Lot 19: ADDITIVE BID SCHEDULE NO. 2 - 8- inch diameter PVC piping ( see Bid Form - 3 for more details)
Lot 20: ADDITIVE BID SCHEDULE NO. 2 Inline 8- inch x 4- inch wye fittings ( see Bid Form - 3 for more details)
Lot 21: ADDITIVE BID SCHEDULE NO. 3 - 8- inch diameter PVC collection system pipe ( see Bid Form - 3 for more details)