USA | CT | MIDDLESEX COUNTY | MIDDLETOWN Small City
City Of Middletown
Installation of Concrete Sidewalks and Extruded Concrete Curbing
Installation of concrete sidewalks and extruded concrete curbing Category I. Concrete Sidewalk Projects 1. Unclassified excavation 2. Structure excavation 3. Remove existing concrete, bituminous or slate walk aprons 4. Remove existing curb 5. 4 Concrete sidewalk 6. 5 Concrete sidewalk 7. 5 Concrete handicap ramps 8. Concrete sidewalks and aprons at driveways 9. Concrete steps 10. Reset slate walks 11. Reset stone curbing 12. Concrete curbing 13. Area restoration 14. Saw cut concrete 15. Saw cut bituminous 16. Drains and under drains 17. Stump removal 6- 12 18. Stump removal 12- 24 19. Stump removal over 24 20. Concrete tree well 21. Stamped concrete 22. Stenciled concrete 23. Unclassified concrete Category II. Installation of Extruded Concrete Curbing 24. Installation of extruded portland cement concrete curbing complete in place 25. Installation of extruded portland cement concrete curbing complete in place 26. Installation of extruded portland cement concrete curbing complete in place 27. Installation of ex
AI helper
The City of Middletown is seeking bids for the installation of concrete sidewalks and extruded concrete curbing. Bids must be submitted by January 27, 2026, at 11:00 AM. A bid bond (10% of the total bid amount) and a labor and material bond (100% of the contract sum) are required. The contract term is for twelve months, commencing on or after February 1, 2026, and terminating on January 31, 2027. The award is subject to prevailing wage rates. Bidders must use the provided forms and return label. Questions must be submitted in writing by January 20, 2026, at 12:00 PM. The city reserves the right to reject any or all bids. The contract will be awarded to the lowest responsible bidder. The work will be authorized by work order and must be completed within the time frame set forth in the work order. The contract term shall be for a period of twelve 12 months commencing on or after february 1, 2026 and terminating january 31, 2027.
The bid notice states bids will be received until tuesday, january 27, 2026 at 11: 00 am.
The bid notice states erms shall be net 30 days.
The bid notice states he bidder shall guarantee his materials and workmanship to be free of defects for the minimum period of twelve 12 months from the date of acceptance by the city.
The bid notice states he contract will be awarded by the owner to the lowest responsible bidder.
The bid notice states he city of middletown may make such investigation as deemed necessary to determine that ability of the bidder to discharge his contract.
The bid notice states failure or neglect to do so shall constitute a breach of contract for which the city may cancel the notice of award, award the bid to someone else, or rebid the entire project as well as sue for damages.