One-year contract for semiannual kitchen hood suppression system inspections, certification, and repairs for 34 systems. Inspections required in December and May/June. Contractor must be certified for brands including Ansul, Pyrochem, Amerex, and CaptiveAire. Firm fixed pricing required. Quotes must be sealed and delivered by December 14, 2026, 2:00 PM CT. Optional site visits available. Level 2 background screening required for school access. Insurance and workers compensation required. Bidder must have at least 3 years experience and provide 2 references.
Quotes must be received by the RFQ opening date/time: December 14, 2026, 2:00 PM CT. quotes received after the rfq opening date time will not be considered.
Payment is made according to the Prompt Payment Act after items are received, inspected, and found compliant. payment will be made according to the prompt payment act after the items awarded to a vendor have been received, inspected, and found to comply with award specifications.
If no sample warranty is provided, the board assumes a minimum one-year warranty from installation/delivery. the board will assume product is guaranteed for a minimum period of one year from date of installation and/or delivery.
Award is based on the lowest and best quote from a responsive and responsible bidder which meets specifications with consideration being given to the specific quality of the product, conformity to the specifications, suitability to school needs, delivery terms, and service and past performance.
Bidder must have at least three years of experience in similar scope and provide two references. The bidder shall be a firm with at least three years experience of similar scope and magnitude of the specified job.
Failure to provide the hood fire suppression system report shall be cause for termination of contract. failure to provide the hoodfire suppression system report shall be cause for termination of contract.
Site visit is optional. site visit is optional. if a contractor requests to visit a site, they must first contact steve anderson, program director food services, at 850 **** to set up a day and time.
Protests must be filed within the time prescribed in section ****, Florida Statutes. failure to file a protest within the time prescribed in section ****, florida statutes, will constitute a waiver of proceedings under chapter 120.
Quotes may be rejected if not sealed, received late, or missing the signed bidder acknowledgement form. quotes will not be accepted unless all conditions have been met and quotes received after the rfq opening date time will not be considered.