Lot 1: Mobilization
Lot 2: Bonds & Insurance
Lot 3: Construction Staking Level II
Lot 4: Stormwater pollution prevention plan
Lot 5: Solid Slab Sodding
Lot 6: 3' x2' Arch Reinforced Concrete Pipe
Lot 7: Headwall for 3' x2' Arch RCP
Lot 8: 8" Concrete Driveway
Lot 9: Remove of 2 Exist. Headwalls w/double pipes per driveway
Lot 10: Remove driveway
Lot 11: Construction Sign
Lot 12: Description UOM Qty 2. 1
Lot 13: Bonds & Insurance
Lot 14: Construction Staking Level II
Lot 15: Stormwater pollution prevention plan
Lot 16: Solid Slab Sodding
Lot 17: 3' x2' Arch Reinforced Concrete Pipe
Lot 18: Headwall for 3' x2' Arch RCP
Lot 19: 18" RCP with end sections
Lot 20: Headwall for 18" RCP
Lot 21: 8" Concrete Driveway
Lot 22: Remove of 2 Exist. Headwalls w/double pipes per driveway
Lot 23: Remove 12" CMP with end sections
Lot 24: Remove 18" square concrete box with headwalls
Lot 25: Remove driveway
Lot 26: Description UOM Qty 3. 1
Lot 27: Bonds & Insurance
Lot 28: Construction Staking Level II
Lot 29: Stormwater pollution prevention plan
Lot 30: Solid Slab Sodding
Lot 31: 18" RCP with end sections
Lot 32: Headwall for 18" RCP
Lot 33: 8" Concrete Driveway
Lot 34: Remove 16" CMP with end sections
Lot 35: Remove 18" CMP with end sections
Lot 36: Remove 18" square concrete box with headwalls
Lot 37: Remove driveway
Lot 38: Adjust Manhole to grade
Lot 39: Guard rail remove & replace complete in place