The City Of Oklahoma City And Trusts
Yard Piping Upgrades Prequalification Requirement is Water Facilities Contractor & ldquo; B& rdquo; OCWUT WC- ****, Yard Piping Upgrades, Booster Pump Station Nos. 10 and 22
Yard Piping Upgrades Booster Pump Station Nos. 10 and 22
Bid Close Date:
Lot 2: Color audio/video recording, pre & post construction ( recorded digitally on dvd)
Lot 1: Sediment & erosion control
Lot 2: Color audio/video recording, pre & post construction ( recorded digitally on dvd)
Lot 3: Traffic bound surface course type a
Lot 4: Reinforcing steel
Lot 5: ( 16 inch) ( DIP) WATERLINE PIPE ( RESTRAINED JOINT)
Lot 6: ( 24 inch) ( DIP) WATERLINE PIPE ( RESTRAINED JOINT)
Lot 7: ( 24 inch) ( DIP) WATERLINE PIPE ( FLANGED)
Lot 8: FITTINGS ( 16 inch X 22. 5 DEGREE BEND) ( MECHANICAL JOINT)
Lot 9: FITTINGS ( 16 inch X 45 DEGREE BEND) ( MECHANICAL JOINT)
Lot 10: FITTINGS ( 16 inch X 90 DEGREE BEND) ( MECHANICAL JOINT)
Lot 11: FITTINGS ( 24 inch X **** DEGREE BEND) ( MECHANICAL JOINT)
Lot 12: FITTINGS ( 24 inch X 45 DEGREE BEND) ( MECHANICAL JOINT)
Lot 13: FITTINGS ( 24 inch X 16IN REDUCER) ( MECHANICAL JOINT)
Lot 14: FITTINGS ( 30 inch X 24IN REDUCER)
Lot 15: FITTINGS ( 24 inch MAGNETIC FLOW METER) ( INSTALL ONLY)
Lot 16: 30 inch X 24 inch TAPPING SLEEVE
Lot 17: Remove and reset fire hydrant
Lot 18: 24 inch TAPPING VALVE AND BOX
Lot 19: Hydrostatic pressure testing and disinfection
Lot 20: Construction staking ( construction survey)
Lot 21: Gps " as- built" survey
Lot 22: Construction signing & traffic control
Lot 23: Mobilization
Lot 24: Clearing and grubbing
Lot 25: Pavement cut and permanent repair ( asphalt)
Lot 26: REMOVE AND REPLACE DRIVEWAY ( 6 inch)
Lot 27: Solid slab sodding
Lot 28: Pipe supports