Pueblo West Metropolitan District
IFB- 2026_ WA- **** Looping Water Main Buckboard to Wild Bill Hickock The Work includes installation of approximately 1, 955 linear feet of 8- inch PVCC900 water line and approximately 120 linear feet of 6- inch PVC C900 water line from Wild Bill HickockDrive to Buckboard Avenue, including connections at Rusty Spur Lane and Rough Rock Lane, in Pueblo West, Colorado. Work includes connections to the existing water distribution system; one existing water service reconnection; four fire hydrant assemblies with
Water main installation Installation of approximately 1, 955 linear feet of 8- inch PVCC900 water line and approximately 120 linear feet of 6- inch PVC C900 water line from Wild Bill Hickock Drive to Buckboard Avenue, including connections at Rusty Spur Lane and Rough Rock Lane in Pueblo West, Colorado. Work includes connections to the existing water distribution system, one existing water service reconnection, four fire hydrant assemblies with 6- inch PVC C900 laterals, one 1- inch combination air/vacuum valve assembly with manhole and vent, removal and salvage of the existing flushing structure at Buckboard Avenue, valves, fittings, groundwater barriers, pipe insulation, trench dewatering, pipeline rock excavation, erosion and sediment control, and site restoration.
Bid Close Date: