The contractor must furnish all labor, equipment, materials, and supervision to replace DW valves at the Rocky Mountain VAMC. Work involves installing isolation shutoff valves on DCW, DHW, and DHWR pipes across multiple buildings (A, E, G, DF, B, H, K, Canteen, L). A site visit is mandatory on September 2, 2026, at 10 am MT. Proposals must be submitted via email by September 16, 2026, by 10 am MT. The project magnitude is between $250,000 and $500,000. Strict adherence to safety, quality control, and infection control (ICRA Level II anticipated) is required.
The period of performance is 140 calendar days from ntp.
The government reserves the right to consider a proposal other than the lowest price that provides additional benefits.
Offerors must be verified by the SBA certification database at the time of offer submission.
postponement due to inclement weather will not cause assessment of the penalty provision outlined above
A site visit shall be held on september 2, 2026, at 10 am mt, please meet at the front of the patriot brew coffee shop. entrance.
all questions in relation to this solicitation should be submitted in writing before september 9, 2026, by 10 am. mt
Failure to be both verified by sba and visible on the sba certification database at the time of offer submission and contract award will result in the offerors proposal being deemed noncompliant.
project magnitude: between 250, 000 and 500, 000.