Sealed proposals are requested for DPW project ****, Agri: Weights & Measures Lab,
HVAC System Replacement in Boise, ID. A pre-bid conference is mandatory on September 11, 2025, at 10:00 AM, at the ISDA Administration Building, **** Old Penitentiary Rd. , Boise, ID. Documents can be obtained by licensed general contractors and licensed mechanical/electrical subcontractors for a refundable deposit of $100. 00. Others can obtain documents at cost (non-refundable). A bid bond in the amount of 5% of the total bid amount, including any add alternates, is required. A public works contractors license for the state of Idaho is required to bid on this work. Proposals will be received until 2:00 PM local time on Thursday, September 25, 2025, at the Division of Public Works, 502 N. 4th St. , Boise, ID 83702. The project includes phase 1: weights and measures full roof replacement, complete demolition of suspended ceiling system, geothermal
HVAC system, lighting, exterior overhead doors, interior doors and frames, and restrooms. install a new standalone
HVAC system, suspended acoustical ceiling system, LED lighting, overhead exterior door, interior doors, frame, hardware and new restrooms. The necropsy will consist of new overhead door, exterior main door, LED lighting work platform, miscellaneous plumbing and interior painting. phase 2: isda administration building will consist of the demolition of the main floor suspended ceiling system, lighting, and insulation below the roof. install new batt insulation below the roof, suspended ceiling system, and LED lighting system. at the basement level replace existing lighting fixtures with new LED lights.