USA | OR | MULTNOMAH COUNTY | PORTLAND | 97251
John Day Dam Powerhouse HVAC Upgrades - NOTICE OF SOLICITATION NUMBER CHANGE The solicitation number for the John Day Powerhouse HVAC Upgrades has changed from **** to **** due to the fiscal- year transition. This is the same acquisition previou
HVAC upgrades at John Day Dam powerhouse Replacement of primary and installation of secondary chillers on two chilled water loops, demolition and removal of existing system, installation of four new chiller skid packages totaling approximately 600 tons of refrigeration capacity, new electrical feeds, chilled water pumps, piping, air handler units, automated digital HVAC control system, water cooled and air cooled condensers, intake and exhaust ducting, fire protection measures, mini split units, structural penetrations, asbestos abatement, lead mitigation
AI helper
HVAC upgrades at John Day Dam powerhouse, approximately 109 miles east of Portland, Oregon. Work includes replacement of chillers, installation of new chiller skid packages (600 tons), new electrical feeds, pumps, piping, air handlers, and automated digital HVAC control system. CMMC Level 2 Self required. Firm fixed price contract. NAICS **** magnitude between $25M and $100M. Tentative solicitation issuance October 2026. Bids due not less than 30 days after issuance. SAM registration required at time of bid submission.
The anticipated completion date for physical construction is 1,004 calendar days after receiving the notice to proceed. The anticipated completion date for physical construction is 1, 004 calendar days after receiving the notice to proceed.
CMMC Level 2 Self is required. the apparent successful offeror must have a current cmmc status atlevel 2 self, or higher, posted in sprs for each relevant cmmc uid in order to remain eligible for award
Failure to meet CMMC requirements will render the offeror ineligible for contract award. Failure to meet this requirement will render the offeror ineligible for contract award.
The estimated magnitude of construction is between $25M and $100M. the estimated magnitude of construction is between 25m and 100m.