City Of San Mateo - CA
Led Luminaire
High Voltage Streetlight Conversion ( Phase 4) - Project Description: 1. Moilization, 2. Temporary Traffic and Pedestrian Control, 3. Remove Luminaire, 4. Remove Striping, Pavement Markings, and Pavement Markers, 5. 2" Full- Width Grinding ( Asphalt Concrete, 6. Hot Mix Asphalt ( Type A) - Overlay, 7. - 9. Thermoplastic Traffic Stripe, 10. Thermoplastic Pavement Markings ( Arrows, Symbols, Words, 11. Post- Top LED Luminaire, 12. Tear- Drop LED Luminaire, 13. Cobrahead LED Luminaire, **** Conduit Connect
High voltage streetlight conversion High voltage streetlight conversion phase 4 project involving mobilization, traffic control, luminaire removal, pavement marking removal, grinding, asphalt overlay, thermoplastic striping and markings, installation of various LED luminaires ( post- top, teardrop, cobrahead), and conduit/trenching work with new conductors and pull boxes.
Bid Close Date: