Placer County Water Agency - CA
Hell Hole Potable Water Supply In accordance with plans and specifications prepared by Stantec, the Work includes the furnishing of all labor, materials, tax, equipment and services for the construction and completion of a new potable water supply system for PCWA Hell Hole cottages, dormitory, worker campground, and USFS boat launch parking lot including, but not limited to, the following: construction of building site pad, gravel access roadway, and prefabricated concrete well building. Installation of new
hell hole potable water supply construction of building site pad, gravel access roadway, and prefabricated concrete well building. installation of new vertical water well, water storage tank, pressure tank, power supply, electrical, telemetry, controls, and piping mechanical systems. install new waterlines approximately 2, 900 linear feet total, valves, usfs spigot, and supporting components for new water supply distribution system. restore asphalt pavement, stabilize, and mulch disturbed soil areas.
Bid Close Date: