San Francisco Unified School District
John O' Connell HS Destructive Testing Package 2- The opening and patch back of selected locations to allow the project design team to evaluate conditions not visible without destruction. The base bid also includes the repair of an exterior wall opened in round 1 of destructive testing, and, as an alternate, water testing of selected windows.
Destructive testing package
Bid Close Date: