City Of Santa Clarita
Traffic Control/ Root Barrier
Safe Routes to School, Placerita Junior High School & Hart High School The City of Santa Clarita is soliciting proposals from qualified contractors to perform street improvements in the area of Placerita Junior High School and Hart High School. This Safe Routes to School project includes new signing and striping, converting driveways into continuous sidewalks, and replacing standard curb ramps with safer bulb outs. Additional curb ramp reconstruction will ensure added ADA accessibility and create a more pre
Bid Close Date:
Lot 1: Mobilization and Demobilization
Lot 2: Water Pollution Control, Implementation and Maintenance of BMPs
Lot 3: Construction Surveying and Monument Preservation
Lot 4: Traffic Control
Lot 5: Remove Existing Striping
Lot 6: Remove Existing Markings
Lot 7: Install Pavement Markings ( White)
Lot 8: Install Pavement Markings ( Yellow)
Lot 9: Install Stripe ( Double- Yellow)
Lot 10: Install Stripe ( White, 6- inch)
Lot 11: Install Curb Markings ( Red)
Lot 12: Install Blue Fire Hydrant Pavement Marker
Lot 13: Remove Existing Sign and Post
Lot 14: Reset or Relocate Existing Sign on New Post
Lot 15: Install Sign and Post
Lot 16: Vehicle Radar Speed Feedback Assembly ( Solar PV- Powered)
Lot 17: Pedestrian Barricade
Lot 18: Remove Existing Asphalt Concrete
Lot 19: Remove Existing Concrete Facility
Lot 20: Remove Existing Handrail
Lot 21: Relocate Existing Mailbox
Lot 22: Remove and Replace Existing Bollard
Lot 23: Adjust to Grade Existing Water Valve
Lot 24: Adjust to Grade Existing Water Meter
Lot 25: Clearing and Grubbing
Lot 26: Unclassified Excavation
Lot 27: Crushed Miscellaneous Base
Lot 28: Asphalt Concrete
Lot 29: Curb and Gutter ( Type A2- Varies)
Lot 30: Concrete Cross Gutter
Lot 31: Concrete Sidewalk
Lot 32: Curb Ramp
Lot 33: Concrete Driveway Approach ( Commercial)
Lot 34: Detectable Warning Surface
Lot 35: Sod and Topsoil Import
Lot 36: Root Barrier