Buildings & General Svs, Office Of Purchasing & Contracting - VT
STATE OF VERMONTCONSTRUCTION INVITATION TO BIDISSUED BY: Department of Buildings & General Serviceson behalf of The Agency of Natural Resources Department of Forests, Parks & RecreationTOWNSHEND STATE PARK UTILITY IMPROVEMENTSISSUE DATE: November 14, 2025BIDDERS CONFERENCE: There will be a non- mandatory pre- bid meeting at the site onDecember 4, 2025 at 10: 30 AM. QUESTIONS DUE: December 4, 2025 at 4: 30 PM ( EDT) RESPONSES DUE BY: December 19, 2025 at 4: 30 PM ( EDT) STATE CONTACT: James MeyersE- MAIL : B
Townsend State Park Utility Improvements Project all existing galvanized or substandard pvc water lines serving the park will be replaced with equal or larger diameter hdpe piping with improved hydraulic characteristics. the service line to the upper toilet building, which runs cross country including an exposed stream crossing and some exposed piping sections will be rerouted to follow road corridors with standard seasonal system depth of burial and enhanced ease of access. the existing water service lines to the residence contact station bathroom building and on to the lower camping loop will be replaced by a dedicated waterline across the large lawn area, with curb stopped service into the bathroom, then follow up and around the camping loop road to service the lowest water stand. an additional service will run from the pumphouse over to another water stand on the entry road. service to the residence will be via existing well supply only. sleeving will be provided at paved road crossings. existing galvaniz
Bid Close Date: