Mdot - Mississippi Department Of Transportation - MS
Overlay approximately 3. 2 miles on MS 403 from the junction with US 82 to the end of State maintenance, known as State
overlay approximately 3. 2 miles on ms 403 from the junction with us 82 to the end of state maintenance ****: removal of asphalt pavement, all depths ****: removal of traffic stripe ****: excess excavation, fm, ah ****: granular material, lvm, class 3, group d ****: asphalt for tack coat ****: saw cut, full depth ****: additional construction signs ****: temporary traffic stripe, continuous white ****: temporary traffic stripe, continuous yellow ****: temporary traffic stripe, skip yellow ****: temporary traffic stripe, detail ****: temporary traffic stripe, legend ****: mobilization ****: standard roadside signs, sheet aluminum, **** thickness ****: standard roadside signs, sheet aluminum, **** thickness ****: square tube posts, 2. 0 lbft ****: asphalt pavement ****: maintenance of traffic ****: temporary portable rumble strips ****: 6 thermoplastic traffic stripe, continuous white ****: 6 thermoplastic traffic stripe, ski
Bid Close Date: