City Of Pilot Point
Pilot Point WWTP Improvements - Work Package # 05 - Aeromod Basin This Work Package includes furnishing and constructing the Aeromod ( Activated Sludge Process) Basin, Blower Building, associated piping, process equipment, and startup services in accordance with the Contract Documents. Key Scope Elements: Furnish all labor, equipment, materials, transportation, supervision, incidentals, and insurance required for construction of the Aeromod Basin and Blower Building. Piping: Excavate, install, connect, test
pilot point wwtp improvements work package 05 aeromod basin furnishing and constructing the aeromod activated sludge process basin, blower building, associated piping, process equipment, and startup services. piping: excavate, install, connect, test, and backfill all piping and manholes. piping systems include: primary effluent pe: line 4drain line dr: line 17acompressed air ca: lines 15a, 15b, 15c, 15d, 15e, 15f, 29asecondary effluent se: lines 5a, 5bsludge sl: line 16construction road maintenance: maintain the construction access road. blowers: furnish and install three 3 blowers complete with variable frequency drives vfds and harmonic filters. permits amp inspections: coordinate and obtain all required permits, certificates, and inspections. site restoration: restore all disturbed areas. borrow area: utilize the borrow area for backfill or disposal of clean spoils. startup amp testing: provide all labor, materials, equipment, services, commissioning, functional testing, and operator training. schedule amp
Bid Close Date: