This is a construction services procurement for the Department of Veterans Affairs to replace and expand chilled water infrastructure in Building 1. The estimated magnitude of this project is between $20,000,**** and $50,000,****. Proposals are due by July 14, 2026, at 10:00 AM Pacific Time. A pre-proposal site visit is mandatory and scheduled for June 9, 2026, at 09:30 AM Pacific Time. The acquisition is a 100% set-aside for certified Service-Disabled Veteran-Owned Small Businesses (SDVOSBs). Both price and technical proposals are required. Performance and payment bonds are required. The period of performance is 915 calendar days after notice to proceed.
Offers are due by July 14, 2026, at 10:00 AM Pacific Time. offer due date is july 14, 2026, at 10:00 a. m. pacific time.
Contractor shall provide a minimum one (1) year warranty, unless specified otherwise in the specs, from both the manufacturer and installer including parts and labor. contractor shall provide a minimum one 1 year warranty, unless specified otherwise in the specs, from both the manufacturer and installer including parts and labor to include normal, premium or holidays hours.
The acquisition method is a competitively negotiated best value tradeoff selection process. acquisition method is competitively negotiated best value tradeoff selection process in accordance with far ****.
Offerors must be certified Service-Disabled Veteran-Owned Small Businesses (SDVOSBs) and verified for eligibility. They must also be registered in the System for Award Management (SAM). his acquisition is setaside 100 for certifiedverifiable servicedisabled veteran owned small business concernssdvosb and offerors are responsible for insuring and verifying their offer and all required documents are received at the address designated in block 8 of the **** solicitation and further specified directly below by the date and time specified in block 13a of the sf **** solicitation subject to amendment.
An organized site visit is scheduled for Tuesday, June 9, 2026, at 09:30 AM Pacific Time. an organized site visit is scheduled for tuesday, june 9, 2026, at 09:30 am pacific time
Failure to affirm being within the safety guidelines (no more than three serious, or one repeat, or one willful OSHA or EPA violations in the past 3 years and an EMR of equal to or less than 1. 0) or submit required safety information may result in a determination of non-responsibility and ineligibility for award. failure to affirm being within the guidelines below or submit this information may result in a determination of nonresponsibility and make the offer ineligible for award.
The estimated magnitude of this construction project is between $20,000,**** and $50,000,****. he estimated magnitude of this construction project is between 20, 000, **** and 50, 000, ****.