Town Of Stratford - CT
Flood Protection Project - Water Pollution Control Facility - The work will entail removal of existing stone riprap, excavation to approximately 3- 4' depth, drilling micropiles, forming and pouring concrete pile caps and concrete walls, placement of fill for earthen embankment, installation gabion wall, reinstallation of stone riprap, and restoration of site. The total length of flood protection is 3, 100 linear feet. A non- mandatory pre- bid conference on Tuesday, 17th February, 2026 at 1: 30PM will begi
flood protection project water pollution control facility removal of existing stone riprap, excavation to approximately 3 4 depth, drilling micropiles, forming and pouring concrete pile caps and concrete walls, placement of fill for earthen embankment, installation gabion wall, reinstallation of stone riprap, and restoration of site. the total length of flood protection is 3, 100 linear feet.
Bid Close Date: