San Diego County Regional Airport Authority - CA
Grinder Equipment Installation
Triturator Drainage Upgrade The project consists of a limited renovation within the existing Triturator building, encompassing approximately 1, 870 gross square feet ( GSF) with no change to the existing building square footage. The scope includes modifications to the existing concrete slab- on- grade to accommodate regrading, improved drainage, and installation of the proposed grinder equipment. All work will be confined to the building interior; no exterior modifications or improvements are part of this s
Bid Close Date: