This solicitation is for the repair of **** electrical and electronic assemblies, boards, cards, and associated hardware. A repair turnaround time (RTAT) of 344 days is required. Government source
inspection (GSI) is required. Freight is FOB origin and handled by the Navy. The resultant award will be issued bilaterally, requiring the contractor's written acceptance prior to execution. The contractor must verify nomenclature, part number, and NSN prior to responding. The quote should include quote amount, unit price, total price, and repair turnaround time. Any delay determined to be excusable (e. g. , government delay) will not result in a price reduction. If a price reduction is required due to unexcusable contractor delay, the contracting officer will implement the aforementioned price reduction via a reconciliation modification at the end of the contract performance. Price reductions made pursuant to this section shall not limit other remedies available to the government for failure to meet required RTATs, including but not limited to the government's right to terminate for default. The resultant contractual delivery requirement is measured from asset return to the date of asset acceptance under the terms of the contract. Return is defined as physical receipt of the F-condition asset at the contractor's facility. The contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the action date entered in CAV must be dated to reflect the actual date of physical receipt. The contractor must obtain final
inspection and acceptance by the government for all assets within the RTATs established in this contract. Additional documents, ordering information, and applicable documents are included as attachments. The contractor must meet all requirements of this contract purchase order. Records of all
inspection work by the contractor shall be kept complete and available to the government during the performance of the contract purchase order and for a period of 365 calendar days after final delivery of supplies. The contractor shall perform all
inspection and testing requirements as specified in the original manufacturer's specifications and drawings. Preservation, packaging, packing, and marking shall be in accordance with the contract purchase order schedule and as specified below. Mil Std **** packaging applies as found elsewhere in the schedule. Ordering information for document references, availability of cancelled documents, commercial specifications, standards, and descriptions, ordnance standards, weapons specifications, and Navord OSTD 600 pages, nuclear reactor publications, technical manuals, interim changes, and classified specifications are detailed in the notice. In accordance with OPNAVINST ****, all documents and drawings provided by the U. S. Navy to prospective contractors must include a distribution statement to inform the contractor of the limits of distribution, and the safeguarding of the information contained on those documents and drawings. Offerors consideration for award of contract shall be given only to authorized distributors of the original manufacturer's item represented in this solicitation. Proof of being an authorized distributor shall be provided on company letterhead signed by a responsible company official and sent with your offer to the procurement contracting officer.