02/24/2025 - USA | NM | SANTA FE COUNTY | SANTA FE | 87594 Small City
Ifb 2025- ****- pw/dk cr- 54 los pinos road all- weather crossing drainage and roadway reconstruction project
Construction services for the CR54 Los Pinos Road Allweather Crossing Drainage and Roadway Reconstruction Project. 1, **** clearing and grubbing ls 1, 2, **** unclassified excavation cy 4, 000, 3, **** borrow cy 2, 000, 4, **** unstable subgrade stabilization sy 420, 5, **** subgrade preparation sy 4, 600, 6, **** major structure excavation cy 1, 300, 7, **** major structure backfill cy 300, 8, **** obliterating old road mile ****, 9, **** basecourse ton 1, 320, 10, **** detour pavement construction sy 2, 800, 11, **** asphalt material for tack coat ton 2, 12, **** prime coat material ton 8, 13, **** minor paving type i, hma spiv ton 900, 14, **** structural concrete, class a cy 20, 15, **** structural concrete, class aa cy 470, 16, **** structural concrete, class a4 sy 100, 17, **** reinforcing bars grade 60 lb 129, 000, 18, **** 24 culvert pipe lf 50, 19, **** 24 culvert pipe end section each 1, 20, **** 42 culvert pipe lf 120, 21, **** 42 culvert pipe end section
AI helper
The Santa Fe County Public Works Department is seeking bids for the construction of a new all-weather crossing on CR54 Los Pinos Road at Arroyo Hondo. The project involves constructing a six-barrel concrete box culvert bridge, realigning and paving roadway approaches, rechannelizing the arroyo, and installing erosion control structures. Bidders must attend a mandatory pre-bid meeting and site visit on March 5, 2025. The bid opening is scheduled for March 25, 2025, at 2:00 PM at the Santa Fe County Purchasing Division. Bid documents, including specifications, plans, and forms, are available online and by contacting the purchasing division. Additional documents required include a non-collusion affidavit, certification of non-segregated facilities, certification of bidder regarding equal employment opportunity, bid bond, performance bond, labor and material payment bond, subcontractor listing, campaign contribution disclosure form, and resident veterans preference certification. The county reserves the right to reject any or all bids. The contract time is 190 calendar days. Liquidated damages of $500 per calendar day will be assessed after the completion date. The county has no preference for any specific process, type of equipment, or kind of material, but will consider all options on a competitive basis. All applicable laws and ordinances apply.