This is a public tender from St. Tammany Parish Government for striping and signage installation services. The scope of work includes providing and installing thermoplastic striping, rumble strips, crosswalks, stop ahead symbols, and various types of signage. Contractors are required to adhere to the Louisiana DOTD standard specifications for roads and bridges. Key general notes for contractors include field verification of all quantities and measurements, responsibility for locating and protecting existing utilities, maintaining two-way traffic at all times, and ensuring proper erection and approval of traffic devices before commencing work. Any additional work performed without prior written approval from the St. Tammany Parish Department of Engineering will be at the contractor's expense. The tender also details extensive insurance requirements, including commercial general liability, business automobile liability, workers' compensation, pollution liability, and professional liability. Contractors must also comply with all applicable federal, state, and local laws and ordinances. The contract documents include detailed general conditions, specifications, and a unit price form for bidding.
The bid notice states that monthly certificates for partial payment will be issued, typically covering 90% to 95% of the work performed and materials stored, with final payment made after project acceptance and lien certificate clearance. The owner shall issue to the contractor certificate of payment in sum sufficient to increase total payments to ninety percent 90 of the contract price.
The bid notice states that the contractor warrants and guarantees to owner that all materials and equipment will be new unless otherwise specified and that all work will be of good quality and free from faults or defects. The contractor warrants and guarantees to owner that all materials and equipment will be new unless otherwise specified and that all work will be of good quality and free from faults or defects and in accordance with the requirements of the contract documents.
The bid notice states that the award of the contract will be to the lowest responsible bidder. The award of the contract, if it is awarded, will be to the lowest responsible bidder, in accordance with state law.
The bid notice states that only contractors licensed by the state to do the type of work involved can submit a proposal. Only the contractors licensed by the state to do the type of work involved can submit a proposal for the work.
The bid notice states that if the contractor fails to complete the work within the specified time, liquidated damages will be assessed. if the contractor shall neglect, fail or refuse to complete the work within the time specified, or any proper extension thereof granted by the owner, then the contractor does hereby agree, as partial consideration for the awarding of this contract, to pay the owner based on table 3. 1 as specified in the contract, not as a penalty, but as liquidated damages for such breach of contract for each and every calendar day that the contractor shall be in default after the time stipulated in the contract for completing the work.
The bid notice states that bidders shall visit the site of the proposed work. Each bidder shall visit the site of the proposed work and fully acquaint itself with all surface and subsurface conditions as they may exist so that it may fully understand this contract.
The bid notice states that samples of materials furnished under this contract shall be submitted for approval. Samples of materials furnished under this contract shall be submitted for approval to the owner when and as directed.
The bid notice states that any protest must be filed no later than ten 10 calendar days after the basis of the protest is known, or should have been known. Any other protest shall be filed no later than ten 10 calendar days after the basis of the protest is known, or should have been known whichever is earlier.
The bid notice states that incomplete, informal or unbalanced bids may be rejected, and if a bidder is concerned with more than one bid, all such bids may be rejected. Incomplete, informal or unbalanced bids may be rejected. Reasonable grounds for belief that any one bidder is concerned directly or indirectly with more than one bid will cause rejection of all bids wherein such bidder is concerned.