This notice is for a public tender for hose, pipe, tube, lubrication, and railing fittings. The closing date is extended to November 15, 2024 due to delays associated with the drawings. The contract purchase order will be used in a crucial shipboard system, and incorrect or defective material would create a high probability of failure. Special emphasis material level I, scope of certification, or quality assured and special control procedures are invoked to ensure receipt of correct material. Applicable documents, specification revisions,
thread piece, testing, certification, non-destructive tests, weld repair, performance, acceptance, o-ring grooves, mating sealing surfaces, general acceptance criteria, welding, brazing,
thread inspection, configuration control, waivers, deviations, engineering change proposal, mercury free, marking, material designator, quality assurance requirements, calibration system, quality system, iso ****, mil i ****, ansi z540, government quality assurance, contractor inspection, subcontractor inspection, government furnished material, traceability, material certification, material handling, receiving inspection, discrepancy reporting, final inspection, material sampling, statistical process control, certificate of compliance, packaging, preservation, critical safety item, critical process, first article pre production models, first article test, government source inspection, quality assurance letter of instruction, objective quality evidence, surface discontinuity, traceability code, verification, nonconformance, waiver, deviation, critical waiver deviation, major waiver deviation, minor waiver deviation, engineering change, engineering change proposal, class i ecp, class ii ecp, distribution statement, ordering information, cancelled documents, commercial specifications, ordnance standards, nuclear reactor publications, technical manuals, interim changes, classified specifications, recent updates. Additional documents, participation criteria, process stages, cost of the dispute, deadlines for clarification and objection, exclusivity for certain types of companies, deadline for starting services, deadline for total delivery of services, etc. are not mentioned.