City Of Shafter
Highway 43 Pipeline Relocation Project The Contractor shall provide all labor, materials, equipment and perform all operations necessaryfor the City of Shafter Highway 43 Pipeline Relocation Project in accordance with the Drawings and theseSpecifications. Contractor shall provide a complete product, ready for operation, and shall includeconnections to existing structures or those constructed by others.
Highway 43 pipeline relocation project Water main pipeline relocation, cased crossing via bore and jack method, underground piping, PVC piping, restrained joint ductile iron piping, tracer wire, locate tape, fittings, valves, thrust blocks, pipe restraints, film wrapping, concrete, fire hydrants, services, pipeline markers, cleaning, leak testing, disinfection, AC pavement removal and reinstallation, painting system, storm drain pipe RCP, catch basins, frames and covers, electrical conduit and boxes, fiber optic conduit and boxes, concrete curb and gutter, hot mix asphalt, aggregate base, gravel areas, demolition removal, grading and subgrade preparation, asphaltic paint binder, fog seal, traffic striping, traffic signs, adjusting existing highway facilities, chain link fence
Bid Close Date: