The Library of Congress is seeking a sign fabricator for wayfinding signage in the Thomas Jefferson Building. Services include preparation, fabrication, delivery, and installation. The contract is a firm-fixed-price type. Key dates include site visits by June 26, 2026, detail drawings by August 31, 2026, material samples by October 15, 2026, fabrication by December 1, 2026, delivery by May 15, 2027, and installation by June 1, 2027. A one-year warranty is also required. The proposal due date is June 10, 2026. Contractors must adhere to strict security protocols for deliveries and personnel access.
Fabrication of wayfinding signage components is due by December 1, 2026, with delivery by May 15, 2027, and installation by June 1, 2027. For optional exterior signage, fabrication is due July 1, 2027, delivery by October 15, 2027, and installation by December 1, 2027. fabricate all wayfinding December 1, 2026 wayfinding signage components May 1, 2027 c. 3. 8 delivery deliver all wayfinding no later than may 15, 2027 components described at section c. 3. 6 c. 3. 9 installation install all wayfinding no later than june 1, 2027 components described at section c. 3. 6
Invoices must be submitted electronically through www. ***. *. * is made upon delivery of items or successful performance of events as identified in Section F, according to contract standards and acceptance criteria. The contractor must prepare and submit invoices electronically to: www. ***. *. *
A one-year warranty is required for the wayfinding signage, starting July 2, 2027, and ending July 1, 2028. An additional one-year warranty is required for optional exterior signage, starting January 2, 2028, and ending January 1, **** year warranty as July 2, 2027 July 1, described in c. 3. 12 2028
The contractor must be highly experienced in sign fabrication. Personnel employed by the contractor shall be capable and qualified. Background investigations will be conducted for contractor personnel requiring unescorted access to library facilities. The library of congress exhibits office eo seeks a highly experienced sign fabricator to provide services needed to prepare, fabricate, deliver, and install wayfinding signage throughout the thomas jefferson building.
Failure to properly indicate all required shipping information can result in items being delivered but not received by the correct recipient, potentially delaying payment. The contractor is responsible for all costs of repairs to ceilings, doors, etc. , and any secondary damage resulting from damage caused by their vehicles. The contractor shall be held responsible for all costs of repairs to ceiling, doors, etc. and any secondary damage resulting from that damage.
Site visits and a field kick-off meeting are required no later than June 26, 2026, to complete field dimensions and review delivery requirements. For optional external signage, a site visit is required no later than February 15, **** site visits, field kick off meeting and site no later than nsp dimensions, meetings visit to complete field june 26, 2026 dimension, review exhibit components and delivery requirements.
Material samples, prototypes, and mockups for two signs are required no later than October 15, 2026. For optional external signage, prototypes are required no later than June 1, **** material samples, deliver prototypes for c1 c no later than prototypes and mockups 2 signs, and m1. october 15, 2026
Contractor employees must visibly display their library ID badges at all times on library premises. Refusal or repeated neglect to display the badge may result in removal from library premises and removal from the contract. Contractor personnel may be prohibited from entering library facilities if alleged to have engaged in discrimination or retaliation. Refusal or repeated neglect to display the library id badge may result in removal from nonpublic library premises and removal from the contract.