Homeland Security, Department Of- U. S. Coast Guard- Ceu Providence( 000G1)
Repair Waterfront Phase 2 at USCG Station Portsmouth Harbor ( New Castle, New Hampshire) - USCG CEU PROVIDENCE Solicitation Number: **** Project Title: Repair Waterfront Phase 2 at USCG Station Portsmouth Harbor, New Castle, New Hampshire Solicitation issued as an Invitation for B
Repair or alteration of other non building facilities Base bid item: rpuid ****, bulkheads north quay wall: work includes chinking and repointing the quay wall. rpuid ****, bulkheads north quay wall rpuid ****, paving: work includes repairing sinkholes voids in the dumpster pad area at the east of the quay wall, including partial demolition and removal of the concrete slab and debris, excavation and installation of a concrete closure wall, backfill, and placement of base course and bituminous pavement. rpuid ****, bulkheads north quay wall rpuid **** fence rpuid **** waterfront fence: work includes removing and replacing the existing fence on the north quay wall, along the limits of repairs. rpuid ****, bulkheads south quay wall: work includes repairing the east wall with interim stone berm, repairing voids in the face of the quay wall, and repairing a sinkhole behind the quay wall. rpuid ****, rip rap: work includes restoring the north rip rap revetment. rpuid ****, rip rap rpuid ****, paving
Bid Close Date: