Lot 1: Clearing and grubbing
Lot 2: Removal of pavement base and surface ( existing asphalt roadway)
Lot 3: Removal of pavement base and surface ( existing gravel roadway)
Lot 4: Removal of concrete curb and gutter
Lot 5: Imported borrow ( select fill)
Lot 6: Compost socks, compost filter berms, or straw wattles
Lot 7: Crushed aggregate base course ( 8" thick)
Lot 8: Asphaltic concrete ( 2" thick) ( wearing course) ( overlay)
Lot 9: Asphaltic concrete ( 6" thick) ( binder course) ( full depth patch)
Lot 10: Cold planing asphalt pavement ( 2" thick)
Lot 11: Concrete curb ( barrier) ( 24" wide)
Lot 12: Concrete curb ( mountable) ( 24" wide)
Lot 13: Mobilization
Lot 14: Painted traffic striping ( 4" width) ( solid line) ( yellow)
Lot 15: Temporary signs and barricades
Lot 16: Water service line ( up to and including 2", long)
Lot 17: Water service line ( up to and including 2", short)
Lot 18: As- builts
Lot 19: Scarifying and compacting subgrade under patches ( 6" thick)
Lot 20: Saw cutting
Lot 21: Construction layout
Lot 22: Adjust sanitary sewer manhole top to finish grade
Lot 23: Adjust water valve cover to finish grade
Lot 24: Cold planing asphalt pavement ( 2" thick wedge, 8' wide)
Lot 25: Tree trimming in right- of- way
Lot 26: Bi- axial geogrid