Pueblo West Metropolitan District
IFB- 2026- WA- **** Water Storage Facility Expansion Tank 140 The Work consists of furnishing all labor, materials, equipment, and incidentals required for the construction of Tank 140, a 3. 3- million- gallon ( MG) AWWA D110 prestressed concrete potable water storage tank, for the Pueblo West Metropolitan District. Work includes site preparation; excavation and grading; construction of the tank foundation system; and complete construction of the prestressed concrete tank, including floor slab, core wall, c
Water Storage Facility Expansion Tank 140 Construction of Tank 140, a 3. 3 million- gallon AWWA D110 prestressed concrete potable water storage tank, including site preparation, excavation, foundation, and tank construction.
Bid Close Date: