This is a firm fixed price contract for swimming pool and deck renovation. The scope includes resurfacing pools and replacing deck tiles with customer-approved materials. The contractor must provide all labor, materials, and tools. A site visit is mandatory to verify existing conditions and dimensions. Submittals include product data, selection samples, and verification samples. Quality assurance requires contractor qualifications and a mockup. The project involves demolition, surface preparation, waterproofing, tiling, and replacement of associated items like nozzles and lights. The contractor is responsible for all expenses, including mobilization and demobilization. A full-time engineer must supervise the project. Work must be inspected and approved by the Contracting Officer's Representative (COR) at each stage. Materials must be new and conform to specifications. Working hours are Monday-Friday, 8:30 AM to 5:00 PM. Security clearances are required for workers and vehicles. The contractor must implement a safety and health program. The project timeline is 90 working days from the Notice to Proceed (NTP), with an anticipated NTP within 6 months of purchase order issuance. A three-year warranty is provided for workmanship and materials, and a fifteen-year warranty for waterproofing.
The execution period of the project should not exceed more than 90 working days. These dates refer to on-site presence of the contractor and are not inclusive of sample finalization and material procurement period. The execution period of project should not exceed more than 90 working days.
This will be a two-time payment contract agreed upon by the contracting officer and contractor/vendor. Once the entire work is finished and the contracting officer approves payment, payment will be made to the contractor/vendor. his will be a twotime payment contract agreed upon by contracting officer and contractorvendor. once entire work is finished and contracting officer approves payment, payment will be made to contractorvendor
The contractor shall guarantee that all work performed will be free from defects in workmanship and materials for a period of three years from the date of certified completion and acceptance. Waterproofing of the swimming pools is guaranteed for fifteen years. The contractor shall guarantee that all work performed will be free from defects in workmanship and materials and that the installation will provide the capabilities and characteristics specified. . . . Waterproofing of the swimming pools to be guaranteed for a period of fifteen years.
Contractor and/or installer qualifications will include a history of swimming pool construction and restoration with contact information of clients for verification of work history. Contractor qualifications: Contractor and/or installer qualifications will include history of swimming pool constructionand restoration with contact information of clients for verification of work history.
Contractors are advised to visit the site, verify the existing site conditions along with re-checking of the target site dimensions provided in the general statement of work to develop their proposal/quote before submission. Contractors are advised to visit the site, verify the existing site conditions along with re check ofthe target site dimensions provided in the general statement of work to develop their proposalquotebefore submission.
For each finish product specified, samples must be presented to Embassy COR for approvals. Verification samples are also required. For each finish product specified, samples must be presented to embassycor for approvals. Verification samples: For each finish product specified, two samples, minimum size 6 inchesby 6 incheswhichever size is available in the market shall be presented to embassy cor forinspection.