Reconstruction of ADA-compliant sidewalk curb ramp at Hillsborough County Department of Corrections, 445 Willow Street, Manchester, NH. Work includes removal of 400 sq ft concrete sidewalk, resetting 35 linear ft granite curbing, subbase prep, concrete reinforcement, new concrete and asphalt, and restriping. Mandatory facility walkthrough on Nov 6, 2026. Proposals due Nov 23, 2026 by 10:00 AM EST. Sealed bids in duplicate. 3-year warranty required. $250/day penalty for late completion. Award to lowest responsible bidder.
Proposals must be received by 10:00 AM EST on Monday, November 23, 2026. responses received after this date and time will not be accepted or recognized.
A minimum 3-year warranty is required covering workmanship, materials, settlement, cracking, and detectable warning surface failures. the bidder shall provide a minimum of three 3 year warranty covering workmanship, materials, settlement, cracking resulting from defective construction.
Award is to the lowest responsible bidder. it is the intent of the county to conform to nh rsa 28: 8e to award a contract to the lowest responsible bidder.
Bidders must provide at least five references and a certificate of insurance. provide at least five 5 references required for consideration.
Late completion may incur a **** per day reduction from the bid price. any day over the completion deadline may be subject to a **** per day reduction from the bid price.
A mandatory facility walkthrough is scheduled. mandatory facility late arrivals will result in automatic disqualification from the vendor walkthrough rfp process.
Written questions must be submitted by November 12, 2026. thursday, november 12, 2026, by 10: 00 am est all questions must be directed to rose. marte@hcnh. gov.
Late arrival at mandatory walkthrough results in automatic disqualification. late arrivals will result in automatic disqualification from the vendor walkthrough rfp process.