This is a public tender for the installation of electrical systems at B829. The contract number is submittal register. The estimated value is between $500,000 and $1,000,000. This requirement is set aside for Woman Owned Small Businesses (WOSB) only. Site visit attendance is mandatory and was held on March 25, 2026, and March 31, 2026. RFIs are due on Tuesday, April 7, 2026. The RFIs will be sent to CE on Wednesday, April 8, 2026. A sign-in sheet has been added to the attachments. The Statement of Work (SOW) and drawings will be sent to those who have RSVP'd for the site visit. RSVP email confirmation of intent to attend is due by **** CST on Friday, March 20, 2026. Contractors must indicate if any of their members need base access in their RSVP. Failure to meet this deadline will result in not receiving site visit information. RFIs are due on Tuesday, March 31, 2026. Calendar invites will be sent to those who have RSVP'd. Copies of all laboratory and field test reports shall be submitted within two working days of the completion of the test. Submit calibration curves and related test results prior to using the device or equipment being calibrated. Submit copies of field test results within 24 hours after the tests are performed. Submit certified copies of test sampling and testings: field density results for approval not less than 30 days before tests. Prior to the delivery of materials, submit certificates of compliance attesting that materials meet the specified requirements. Certified copies of the material certificates shall include the following: sod vendors, fertilizer.
The bid notice does not explicitly state a delivery deadline for the overall project. However, it mentions that copies of all laboratory and field test reports shall be submitted within two working days of the completion of the test, and field test results within 24 hours after the tests are performed.
The bid notice includes a line item for product data warranty letter which suggests warranty information will be a required submittal.
This requirement is set aside for Woman Owned Small Businesses (WOSB) only. Site visit attendance is mandatory to be considered responsive.
Site visits were held and concluded on March 25, 2026, and March 31, 2026. Site visit attendance is mandatory to be considered responsive. RSVP email confirmation of intent to attend is due by **** CST, Friday, March 20, 2026.
All RFIs (Requests for Information) are due on Tuesday, April 7, 2026.
The estimated price is described in terms of the following price range: between $500,000 and $1,000,000.