Msk Engineers - VT
Improvements to the water system, including waterline installation via directional drilling method, water treatment building construction, hydropneumatic tank replacement, chlorine analyzer, Ion exchange system for radium, drywell for ion exchange backwash, 5- micron particle filters, telemetry controls improvements, dehumidification/air handling, booster pump replacement, and site improvements. This project is funded in part through the Vermont Drinking Water State Revolving Fund. Consequently, the follow
improvements to the water system, including waterline installation via directional drilling method, water treatment building construction, hydropneumatic tank replacement, chlorine analyzer, ion exchange system for radium, drywell for ion exchange backwash, 5 micron particle filters, telemetry controls improvements, dehumidification air handling, booster pump replacement, and site improvements
Bid Close Date: