Ceres Unified School District
CVHS Stadium Phase 2- The proposed project generally includes but is not limited to the following items. This list is generic and is not intended to include all the work required for the project. It is assumed that the Phase 2 project construction will occur concurrently with the Phase 1 Project, already under construction. Site WorkAll adjacent site work to the new buildings which includes concrete flat work, planters, trees, and the connection to the utility stub ups provided in Phase I. Home and Visitor
cvhs stadium phase 2 construction of two new 1, 472 square foot team room locker room, and restroom buildings clad in cement plaster, thin brick, veneer, and metal panels. the roofing includes a single ply membrane system. the structural system is primarily wood on continuous footings and beams to support various openings and overhangs. the interior of the building includes gypsum board, cement plaster, ceramic tile, frp panels, resinous flooring, polished concrete, modular casework, and various mechanical, electrical, and plumbing fixtures. construction of a new visitor snack bar 1, 552 square foot snack bar, and restroom building clad in cement plaster, thin brick, veneer, and metal panels. the roofing includes a single ply membrane system. the structural system is primarily wood on continuous footings and beams to support various openings and overhangs. the interior of the building includes gypsum board, cement plaster, ceramic tile, frp panels, resinous flooring, polished concrete, modular casework, food
Bid Close Date: