Lot 1: *** ONLY ONLINE BIDS WILL BE ACCEPTED FOR THIS RFB. *** Emailed and hard copies delivered by any method WILL NOT BE ACCEPTED. On this line, Bidders must enter $ 0. 00 for Contract Amount in the e-
procurement system. Actual Contract Amount must be entered on "
Official Bid Document" and submitted as an attachment in the e-
procurement system. Vendors should review and update, if necessary, all addresses and contact persons for their account prior to bid submission. This information will carry forward to a contract if awarded, therefore please ensure all information is correct. ** Entire
Official Bid Document and Bid Bond ( if required) should be combined as one PDF and uploaded** Drainage from eligible works are located upslope of the citizens residence impacting the residence and yard area. A
slide has also occurred on the slope behind/beside the citizens residence impacting yard drainage. This project addresses the
slide removing a quantity of material and grading the remainder in place in a stable configuration. A Concrete Block- Tied Mat ditch will be installed from the top of the
slide to a planned drop box at the toe. Drainage will also be collected by installation of subdrain along the toe of the highwall. All collected drainage will be routed to a second drop box installed on the existing pipe
crossing KY- 194 and ultimately the roadside ditch. Concrete Block- Tied Mat ditches will also be installed to control surface drainage from the adjacent roadway and conduct drainage down the slope to the drop box and existing culvert. All material generated by construction activities will be wasted onsite.