USA | NJ | MONMOUTH COUNTY | MATAWAN | 07747 Small City
Hot Mix Asphalt
Public Notice to Bidders- 2026 Edgewater Drive Improvements Addendum No. 1 April 17, 2026
Water Main Replacement and Roadway Resurfacing 4. 00 pavement items hot mix asphalt **** 4. 01 ton 709 surface course, 2 thick hot mix asphalt **** 4. 02 ton **** base course, 4 thick 4. 03 hma driveway aprons, 4 thick sy 100 5. 00 potable water items 8 ductile iron pipe 350 psi 5. 01 lf **** awwa c150 5. 02 8 gate valve un 3 5. 03 12 wet tap un 2 5. 04 1 copper service laterals un 34 5. 05 utility crossing allowance usd 10, **** 5. 06 fire hydrant assembly un 3 5. 07 temporary bypass un 4 6. 00 storm sewer 6. 01 eco type n, curb piece un 7 6. 02 bicycle safe grate un 7 7. 00 traffic control 7. 01 drum if where directed un 5 7. 02 breakaway barricade un 5 if where directed 7. 03 construction signs sf 50 if where directed 7. 04 uniformed traffic director hr 40 4hr min, if where directed 8. 00 traffic paint 8. 01 traffic stripes, longlife lf 330 epoxy, 4 wide yellow 8. 02 traffic stripes, longlife thermoplastic, 24 wide sf 17 9. 00 landscaping 9. 01 topsoiling, 4 thick sy 200 if where directed 9. 02 fert
AI helper
This is a public tender notice for the Edgewater Drive Water Main Replacement and Roadway Resurfacing project in the Borough of Matawan, Monmouth County, NJ. The scope of work includes various pavement items such as hot mix asphalt for surface course and base course, as well as driveway aprons. It also involves potable water system components like ductile iron pipe, gate valves, wet taps, and service laterals. Storm sewer work includes curb pieces and grates. Traffic control measures, including drums, barricades, signs, and uniformed traffic directors, are required. The project also entails traffic paint for stripes and thermoplastic markings. Landscaping elements such as topsoiling and seeding are included. Miscellaneous items cover valve resets, asphalt and fuel price adjustment allowances, concrete curb, sanitary sewer slip lining, and permit allowances. A preconstruction video is also part of the scope. The notice provides a detailed list of pay items with units and quantities, but unit prices and total costs are to be filled in by the contractor.