Town Of Eatonville - FL
Trenching And Backfill
Drinking Water - Phase 1 - The Project consists of the relocation, construction, connection, testing, disinfection, and placement into service of potable water main improvements within the Town of Eatonville distribution system along Kennedy Boulevard as part of the Phase 1 improvements, as shown on the plans and further described in these specifications to complete a fully functional system. Construction includes, but is not limited to, relocation of approximately 600 linear feet of existing potable water
Relocation, construction, connection, testing, disinfection, and placement into service of potable water main improvements along Kennedy Boulevard in Eatonville, Florida Relocation of approximately 600 linear feet of existing potable water main, installation of new water main, fittings, valves, and appurtenances, removal or abandonment of existing potable water main, connections to existing distribution system, maintenance of water service during construction, protection of existing utilities, temporary and permanent traffic control, trench excavation, bedding, backfill, compaction, pavement, sidewalk, driveway and surface restoration, testing, disinfection, and commissioning of new water main
Bid Close Date: