City Of Ventura-CA
Waterline Repair: Camden- Hanover Project
waterline repair: camdenhanover project 1 ls mobilization 2 1 ls stormwater pollution prevention measures 3 1 ls traffic control 4 220 lf 8inch pvc pipe within sand dr14 5 208 lf 18inch rc pipe within sand 6 11 pieces 8inch locking ring gaskets 7 2 ends seal end grout plug 8 2 pieces 8inch mega lugs 9 22 pieces 8inch inside of 18inch rcp stainless steel casing spacers 2 per stick 10 22 cy 1foot of import trench backfill 11 1 cy concrete for thrust block repair if found to be damaged 13 1 ls rock revetment restoration 14 20 days groundwater dewatering 15 1 ls mobilization for groundwater dewatering 16 250 subgrade stabilization 1footthick layer of 3inch to 4inch minus lf floatrock 17 4 ea restrained harness at existing gate valves 18 1 ls leakage and pressure testing 19 1 ls disinfection of waterline 20 1 ls backfill native sand material 21 1 ls demobilization
Bid Close Date: