City Of Memphis - Tn - Public Works
Road Plate and Trench Box Rentals ( Excavation Safety Equipment)
Bid Close Date:
AI email alerts, regional filters, and access to bid documents
Road Plate and Trench Box Rentals ( Excavation Safety Equipment)
Bid Close Date:
Summit Dr. Waterline Replacement - The City of Farmington, New Mexico (" OWNER") is requesting Bids to furnish all labor, equipment, and materials to replace the old 1, 520- foot, 6- inch cast iron water main line and customer service lines with new 8- inch PVC lines. Unless otherwise stated in the Contract Documents, Engineering for this project, along with the Contract Documents, were completed by the City of Farmington, Municipal Annex Building, 805 Municipal Drive, Farmington, New Mexico
Summit Dr. Waterline Replacement 1 8 pvc water main dr18 2 6 pvc water main dr18 3 8 gate valve with box 4 6 gate valve with box 5 cut and cap existing watermain 6 iron fittings, 12 dia. under 7 6 megalug ductile or pvc 8 8 megalug ductile or pvc 9 water service connection new main to existing meter can to remain in place 58 or 1 1 addl length of service pipe for 58 1 services 1 phys. separate existing waterline to cut in valve or fitting, all sizes and types 1 fire hydrant 4, 5, or 6 1 remove existing fire hydrant all depths 1 air relief valve assembly inc. vault 14 pipe or larger 1 load, haul dispose unsuitable material 10 mile free haul 1 pipe bedding material for pipe trench 1 2 standard curb gutter rem. , disp. rplce 1 4 concrete sidewalk or slope pavement remove, dispose replace 1 6 drivepad or valley gutter removal, disposal, replacement 2 subgrade prep 2 base course in place 2 asphalt removal disposal, 10 mile free haul 2 hot mix sp iv or equivalent 2 traffic control 2 testing allowance 2 portable toil
Bid Close Date:
N. Dustin 8" Waterline Replacement ( 30th St to 35th St) - The City of Farmington, New Mexico (" OWNER") is requesting Bids to furnish all labor, equipment, and materials to replace 1, 680 linear feet of the aging 8- inch asbestos cement water main with new 8- inch PVC pipe. All components will be fully removed and replaced to ensure reliability and meet safety standards. Unless otherwise stated in the Contract Documents, Engineering for this project, along with the Contract Documents, were completed by the
Waterline Replacement 1 8 pvc water main dr18 2 6 pvc water main dr18 3 8 gate valve with box 4 cut and cap existing watermain 5 iron fittings, 12 dia. under 6 6 megalug ductile or pvc 7 8 megalug ductile or pvc 8 water service connection new main to existing meter can to remain in place 58 or 1 9 addl length of service pipe for 58 1 services 1 phys. separate existing waterline to cut in valve or fitting, all sizes and types 1 air relief valve assembly inc. vault 14 pipe or larger 1 load, haul dispose unsuitable material 10 mile free haul 1 pipe bedding material for pipe trench 1 2 standard curb gutter rem. , disp. rplce 1 6 drivepad or valley gutter removal, disposal, replacement 1 subgrade prep 1 base course in place 1 asphalt removal disposal, 10 mile free haul 1 hot mix sp iv or equivalent 2 traffic control 2 testing allowance 2 portable toilet 2 mobilization and demobilization
Bid Close Date:
D10 - Trench Box
Bid Close Date:
Lot 1: Each
Lot 2: Each
Lot 3: Each
Trinity River Authority of Texas - Technical Proposal - CRWS Elm Fork Interceptor Rehabilitation and Replacement, Phase 1, CAC- 8A The Project scope generally includes but is not limited to the following major items: 1, 480 linear feet ( LF) of 66- inch to 84- inch gravity wastewater line by open- cut; 1, 000 LF of 84- inch gravity wastewater line by- other- than- open- cut; 1, 670 LF of 54- inch to 84- inch gravity wastewater line by open- cut; 200 LF of 66- inch gravity wastewater by- other- than- open- c
trinity river authority of texas technical proposal crws elm fork interceptor rehabilitation and replacement, phase 1, cac 8a 480 linear feet lf of 66 inch to 84 inch gravity wastewater line by open cut 1, 000 lf of 84 inch gravity wastewater line by other than open cut 1, 670 lf of 54 inch to 84 inch gravity wastewater line by open cut 200 lf of 66 inch gravity wastewater by other than open cut 80 lf of 48 inch wastewater by open cut 200 lf of 18 inch polyvinyl chloride pvc force main 160 lf of 8 inch hdpe sanitary sewer pipe by open cut 11 ndash connections to existing interceptors and points of entry 17 frp or polymer manholes two ndash fiberglass junction boxes pipeline construction and earthwork across two 2 locations of creek and aerial crossings, including construction of a cofferdam and rebuilding a spillway structure 500 lf of storm drain replacement per txdot standards 50 lf of waterline relocation grout filling of existing interceptors, manholes, and junction structures relocation of fiber optic an
Bid Close Date:
Expands your search so you don't miss relevant opportunities.
Get opportunities by email; open bid documents or the official posting; view them on the map.
Filter by region, method, and value; favorite items and add notes to organize opportunities.
Add words related to your products or services. Our AI broadens the search so you don't miss opportunities.
Start the 14-day free trial and receive alerts with links to bid documents or the official posting.
Add or edit keywords, set regions, choose your email delivery schedule and email style. Map view available in the dashboard.
Easy to find the bids.
It’s easy to stay connected to bids across multiple municipalities at the same time. Bids are easy to view.
I’m notified immediately about every bid that opens in my area. It really helps my work.
I get exactly what I asked for—quickly, daily, and simply. The search arrives pre-filtered, so there’s no time wasted digging through countless websites, and it’s always up to date!
Well-focused searches and highly professional service. It’s been very useful, and hiring you was the right decision. With agility and confidence in our market segment, it’s driving our revenue growth.
It’s one of the best platforms for searching bids.
I’ve used another platform before, and after discovering this one, I can see it’s much better. I find my bid opportunities faster, which speeds up my work.
Now we get information about upcoming bids in our segment with enough time to find partner participants.
It’s very good — it really helps us find service opportunity bids.
I receive the bid updates by email.
Very good service, met expectations.
I gain convenience—I have all the bids in one place.
Explore a term, enable AI email alerts, access bid documents or the official posting, and filter by region and method.