Dept Of Defense- Dept Of The Air Force- Air Education And Training Command- Joint Base San Antonio- Fa3016 502 Cons Cl
Resistant Ductwork
Lease & Installation of Heating, Ventilation and Air conditioning ( HVAC) Equipment to Support Military Working Dog ( MWD) Kennels - Site Visit Update: A site visit will be scheduled for Thursday, 16 July 2026 at 9: 00 am CDT at JBSA Lackland, TX. The meeting place will be the Luke East Gate visitor 39; s center ( **** Luke Blvd, Lackland Air Force Base, TX ****). Depart
Lease and installation of heating, ventilation, and air conditioning ( HVAC) equipment to support military working dog ( MWD) kennels. Lease, installation, operation, and maintenance of a temporary HVAC system to ensure MWD kennels are kept within a temperature range of 45- 85 F. This includes surveys, furnishing equipment, labor, layouts, supervision, maintenance and servicing of generators, fuel, auxiliary tanks, HVAC units, drywells, and appurtenances. The contractor is responsible for enclosure of the kennel roof gable, providing fuel and maintaining refueling service for generators, and ensuring all HVAC units and generators are at 95% serviceability. Emergency maintenance response time is no less than 2 hours, 24/7. The contractor must also devise a plan for installation and maintenance, haul and remove equipment, restore the site to its original condition, and provide a work plan narrative. Procurement and installation of turnkey operational hardware, appurtenances, rodent- resistant ductwork, and ele
Bid Close Date: