USA | MO | BUCHANAN COUNTY | ST JOSEPH | 64507
Small City
Missouri Western State University - MO
Fiber Optic Cable Installation/ Fiber Optic Splicing/ Fiber Termination/ Campus Network Infrastructure/ Fiber Optic Installation
Campus Fiber Backbone Installation Project
Installation of underground conduit and fiber optic cable at Missouri Western State University campus Scope 1: Install underground conduit and fiber optic cable from existing splice point on west campus drive to Kit Bond Incubator Building; approximately **** feet of conduit and **** feet of fiber; includes 2- inch HDPE conduit, **** underground handholes, 12 solid copper tracer wire, 12- count single mode fiber optic cable, splicing to 72- count fiber, fiber housings, panels, and SCAPC terminations. Scope 2: Install underground conduit and fiber optic cable from existing splice point on west campus drive to Physical Plant Main Office Building; approximately 650 feet of conduit and 900 feet of fiber; includes 2- inch HDPE conduit, handholes, tracer wire, 6- count single mode fiber optic cable, splicing to 72- count fiber, fiber housings, panels, and SCAPC terminations.
AI helper
Missouri Western State University seeks bids for installation of underground conduit and fiber optic cable in two scopes: to Kit Bond Incubator Building and Physical Plant Main Office. Mandatory prebid meeting on October 8, 2026 at 1:00 PM at **** Mitchell Ave, St. Joseph, MO. Proposals due October 23, 2026 by 2:00 PM CST. Questions due by October 13, 2026. Work must be completed by December 4, 2026. Bid bond of 5% required. Prevailing wage and OSHA safety training requirements apply. 1-year warranty on parts and installation required.
All work must be completed by December 4, 2026. As stated: All work to be completed by december 4, 2026.
Payment in full will be made within 45 days after receiving invoices for goods/services rendered as meeting all performance specifications. As stated: payment in full will be made within fortyfive 45 days after receiving invoices for goods sservices rendered as meeting all performance specifications.
Installer shall provide a 1-year warranty on parts and installation. As stated: installer shall provide 1year warranty on parts and installation.
Contractor must provide ten-hour OSHA construction safety program for all onsite employees. As stated: contractor and all subcontractors shall provide a tenhour occupational safety and health administration osha construction safety program.
A mandatory prebid meeting will be held at the job site. As stated: a mandatory prebid meeting will be held at the job site located at **** mitchell saint joseph mo, **** on thursday october 8, 2026 at 1: 00 p. m.
Questions and/or requests for clarification must be submitted by October 13, 2026 at 9:00 AM CST. As stated: all questions andor clarifications can be sent at any time regarding this rfp to thepurchasing department until 9: 00 a. m. cst on october 13, 2026.
Proposals may not be accepted if the RFP number is not on the outside of the envelope. As stated: proposals may not be accepted if the rfp number is not on the outside of the envelope.