Dept Of Defense- Dept Of The Army- Usace- Pod- W2Sn Endist Japan
Hvac Systems/ Repair/ Hvac Contractors
Prequalification of Sources - Sollars ES HVAC Upgrades, Misawa Air Base, Japan - * 5/28/2026 Update: RFI response posted. The prequalification criteria has been revised. Attachment I - Construction Info Sheet has been revised. The Government received the following RFI during the Prequalification o
HVAC Upgrades Sollars Elementary School HVAC upgrades, including heating system upgrade and addition of full building cooling capabilities for 5 buildings ( 80, 90, 92, 94, 98). Scope includes transformer upgrades, structural roof changes, removal and replacement of HVAC systems and supporting building systems ( ceilings, partitions, lighting, power, fire protection), roof upgrades at B94, reinforcement of structural beams and columns at B94, construction of a new central plant enclosure, new mechanical rooms at B90 and B98, and associated site work ( trenching, repaving, resodding, transformer removal, site structure removal).
Bid Close Date: