Concord University is seeking bids for DOAS unit installation services. Key services include demolition, removal, installation of new unit, piping, electrical, ductwork, roofing, and structural steel. A mandatory pre-bid meeting is scheduled for July 16, 2026, at 10:00 AM. Questions are due by July 21, 2026. Proposals are due by August 26, 2026, at 2 PM. The award will be made to the bidder with the highest point total based on qualifications, experience, company background, services, and price.
Proposals are due by August 26, 2026, at 2 PM.
Payments for goods/services will be made in arrears only upon receipt of a proper invoice, detailing the goods/services provided or receipt of the goods/services, whichever is later. Vendor must accept payment by electronic funds transfer and/or pcard.
The vendor expressly warrants that the goods and/or services covered by this contract will conform to specifications, be merchantable and fit for the purpose intended, and be free from defect in material and workmanship. A two-year maintenance bond covering the roofing system is also required.
Award will be made to the bidder receiving the highest point total, with points assigned for qualifications, experience, company background (20 points), services (50 points), and price (30 points).
Vendors must provide a statement of qualifications of individuals assigned direct responsibility, describe experience of key personnel, firm's size and ability to fulfill terms, related experience, a description of how work will be conducted including quality assurances, a proposed schedule, and references from at least three higher education clients.
Liquidated damages are not included in this contract, but the commission institution reserves the right to cancel the contract immediately upon written notice if materials or workmanship do not conform to specifications.
A mandatory pre-bid meeting will be held on July 16th, 2026, at 10:00 AM at Science Hall, Concord University, Athens, WV. All vendors submitting a bid must attend.
Failure to comply with mandatory terms, failure to attend the mandatory pre-bid meeting, failure to acknowledge addenda, submitting bids electronically that do not arrive on time or contain corrupted files, and communication with institution personnel outside of the director of procurement can lead to disqualification.