Town Of South Windsor - CT
Reconstruction of Abbe Road Phase I In general, the work to be performed under this contract is for the full depth reconstruction of approximately 1, 350 feet of Abbe Road and the mill and overlay of approximately 450 of Cornfield Drive. This includes installation of new drainage pipe, catch basins and manholes, excavation and removal of the existing pavement and base material down to the subgrade as shown on the plans, installation of new processed aggregate base material, 2 lifts of new HMA pavement, fine
Bid Close Date: