City Of Beaverton - OR
22nd Street and Hart Road Waterline and Sewer Rehab Projects
Public Water and Sewer Improvements Schedule A - CIP ****: SW 22nd Street Whistling Ct to Hall Blvd Glenn Drive Public Water and Sewer Improvements This project involves the installation of approximately 4, 000 linear feet of zinc- coated ductile iron potable water pipe wrapped in polyethylene, in sizes of 8 , 6 , and 4 . Thirteen waterline connection details are included in the scope, with potholing required as part of the bid for select areas of the alignment. Additionally, the project includes the replacement of two existing sewer cleanouts with new manhole structures. Located along a residential, high- traffic corridor, this project will require a comprehensive traffic control plan. Construction activities in certain areas will necessitate the use of flagging operations. Schedule B - CIP ****: SW Hart Road Traffic Circle Public Waterline Improvements This portion of the project includes the installation of approximately 1, 800 linear feet of zinc- coated ductile iron potable water pipe poly wrapped, with
Bid Close Date: