Lot 1: Mobiliize/demobilize, for new wells includes: obtain permits, prepare well reports, finish reports, logs, data, and
Lot 2: Drill shallow pilot hole, includes formation sampling, fluid/solid handling, drum/tanks
Lot 3: Geophysical logging shallow pit hole
Lot 4: Drill and set 8- inch sch 40 pvc casing, includes cost to change drilling mud
Lot 5: Drill deep pilot hole, includes formation sampling, fluid/solid handling, drums/tanks
Lot 6: Geophysical logging deep pit hole
Lot 7: Drill and set 4- inch pvc well
Lot 8: Well development, includes management of development water
Lot 9: Pumping test, 6- hour, includes testing, data collection, reporting and water management
Lot 10: Pump, pitless adapter, plumbing, conditioner, electrical, and incidental materials, furnish and install
Lot 11: Potability certification sampling and analyses
Lot 12: Well decommissioning ( abandonment) gauge well, remove/split casing, tremmie grout, including dug wells
Lot 13: Removal of pump, pitless adapter, piping, and installation of well protector, pad, and incidental materials for well
Lot 14: INSTALLATION OF REDI- Flo2, INCLUDES INCIDENTAL MATERIALS AND LABOR FOR PUMP INSTALLATION
Lot 15: DELIVERY AND TESTING OF REDI- Flo PUMP CONTROLLER, INCLUDES INCIDENTAL MATERIALS AND LABOR
Lot 16: Technician, hourly rate for maintenance and repairs , regular time, per person
Lot 17: Technician, hourly rate for maintenance and repairs, overtime, per person
Lot 18: Helper, hourly rate for maintenance and repairs, regular time, per person
Lot 19: Helper, hourly rate for maintenance and repairs, overtime, per person
Lot 20: Well drilling rig, hourly rate for maintenance and repairs
Lot 21: Ditching equipment, hourly rate for maintenance and repairs
Lot 22: Fluids such as rinse water, decontamination fluids, well development water or other materials containing free liquids,
Lot 23: Mud cans, as needed, any size well to include delivery, removal, and the proper disposal of the mud
Lot 24: Site restoration to the conditions prior to construction, per square yard, per specifications
Lot 25: Wells greater than 400 feet - drill and set 8- inch sch 40 black steel casing, includes cost to change drilling mud
Lot 26: Wells greater than 400 feet- drill and set 4- inch sch 40 stainless steel well
Lot 27: Video inspection of wells
Lot 28: Technician, hourly rate for well services, regular time, per person
Lot 29: Technician, hourly rate for well services, overtime, per person
Lot 30: Helper, hourly rate for well services, regular time, per person
Lot 31: Helper, hourly rate for well services, overtime, per person
Lot 32: Well rig, hourly rate for well services