Chelan Douglas Regional Port Authority
Concrete Tank/ Asphalt Paving
Pangborn Memorial Airport Airport Fleet Vehicle Fueling System- Work associated with proposed improvements is generally described as follows: Installation of a 4, 000- gallon double walled above- ground fuel storage System containing 3, 000 gallons of diesel fuel and 1, 000 gallons of unleaded gasoline. Concrete tank footings, tank pad, fueling pad will be installed. Work includes design of fuel tank footing, excavation, pavement demolition, asphalt paving, lighting, and drainage improvements.
Bid Close Date: