Centerline Architects - VT
Attention: General Contractors, HVAC Contractors, Electrical Contractors, Insulation and other specialty Contractors. The Project consists of the replacement of the majority of the HVAC and mechanical equipment within the building as well as upgrades to insulation, windows and doors. This will include utilizing electric- sourced heat pumps for cooling and heating, replacement of boilers, HRV ventilation equipment, replace air handling units, required ductwork, and system controls. Insulation and air seal th
Replacement of HVAC and Mechanical Equipment Replacement of HVAC and mechanical equipment, upgrades to insulation, windows and doors, electric sourced heat pumps, replacement of boilers, HRV ventilation equipment, replace air handling units, required ductwork, and system controls. Insulation and air seal the walls, floors and ceiling where possible and also in the attic area. Insulate and air seal the windows and doors.
Bid Close Date: