Dept Of Defense- Dept Of The Navy- Navsup- Navsup Global Logistics Support- Navsup Flc Sigonella- Navsup Flc Sigonella Naples Office
Boat Slips/ Boat Building
NSAND Gaeta Floating Pier - Remove and replace Port Operations floating pier in Gaeta. During removal and installation a capability to harbor 4 boats must be maintained at all times. Work must be completed in FY26. New pier will need an increased harboring capacity of 5 boat
Floating pier installation Removal and replacement of port operations floating pier in Gaeta, with a capability to harbor 4 boats during the process. Installation of new floating pier sections to create 30 meters of floating pier with 5 boat slips. Each slip to be 8 meters long by 1. 80 meters wide, with rubber fenders and mooring cleats. Pier structure to be hot- dip galvanized, floats cased in polyethylene, and filled with expanded polystyrene. Teak wood flooring on aluminum alloy side members. Handrails or stanchions with nylon rope for safety. Pier to withstand winds of 50 knots and wave height of 50cm.
Bid Close Date: