SDVOSB set-aside. Firm-fixed-price award for condensate pump replacements at West Haven VAMC. Mandatory pre-bid walkthrough on November 14, 2026 at 8:30 AM in Building 16 boiler plant. Quotes due December 3, 2026 by 10:00 AM EST via email. Evaluation factors: price, past performance, technical. Must be registered in SAM. Field representative within 200 miles and OEM-trained required. Performance period 120 calendar days from NTP. Two-year warranty on parts, materials, and labor required.
Performance period is 120 calendar days from notice to proceed (NTP), including contractor closeout. Scheduled installation must be coordinated with a facility steam outage. The place of performance for this contract will be 120 calendar days from notice to proceed ntp and includes contractor closeout.
Vendor must supply a minimum warranty of all parts, materials, and labor for at least two years. Vendor shall supply and furnish a minimum warranty of all parts, materials, and labor for a minimum of two years.
Award will be made to the best value, considering price and other factors. Award shall be made to the best value, as determined to be the most beneficial to the government.
Bidders must have a field representative within 200 miles of West Haven campus and OEM-trained on the specific equipment. Bidders shall have a field representative located within 200 miles of the west haven campus. . . and have been trained by the original equipment manufacturer oem on the specific model of equipment.
Mandatory pre-bid walkthrough on November 14, 2026 at 8:30 AM at Building 16 boiler plant. Bidders shall perform a prebid walkthrough at 8:30 a. m. on november 14, 2026 and plan to meet in the building 16 boiler plant.
Offers received after the due date and time shall not be considered. Failure to provide requested information may result in removal from evaluation. Offers received after the due date and time shall not be considered.